Right to Repair Housing (Scotland) Act 2001

Important

This is only a general guide. It is not a complete statement of the law. If you want to know more about your rights, you should get advice from us or a solicitor or your local Citizens Advice Bureau. 

What is the right to repair?

Under the Housing (Scotland) Act 2001, our tenants have the right to have small urgent repairs carried out by Grampian Housing Association within a given timescale.  This is called the Right to Repair scheme.

The Right to Repair scheme applies to all tenants of local authorities, housing associations (including tenants who are members of fully mutual co-operative housing associations) and water and sewerage authorities.

What repairs come under the Right to Repair Scheme?

The scheme covers certain repairs up to the value of £350.  These repairs are known as 'qualifying' repairs.  They include:

  • unsafe power or lighting sockets or electrical fittings;
  • loss or part loss of electric power;
  • loss or part loss of gas supply;
  • a blocked flue to an open fire or boiler;
  • external windows, doors or locks which are not secure;
  • loss or part loss of space or water heating if no alternative heating is available;
  • toilets which do not flush (if there is no other toilet in the house);
  • blocked or leaking foul drains, soil stacks or toilet pans (if there is no other toilet in the house);
  • a blocked sink, bath or basin;
  • loss or part loss of water supply;
  • significant leaking or flooding from a water or heating pipe, tank or cistern;
  • unsafe rotten timber flooring or stair treads;
  • unsafe access to a path or step;
  • loose or detached bannisters or handrails; and
  • a broken mechanical extractor fan in a kitchen or bathroom which has no external window or door.

We will be able to tell you if a repair you need is included in the scheme. They will also let you know:

  • the maximum time the repair must be done in; and
  • how they deal with repairs that are not covered by the scheme.

What happens when I report a repair?

When you report a repair, we will let you know whether it is our responsibility and whether it is a qualifying repair under the Right to Repair scheme. We may need to inspect your home to find out whether the repair is a qualifying repair or not.

If the repair does qualify under the scheme, we will:

  • tell you the maximum time allowed to carry out the repair;
  • tell you the last day of that period;
  • explain your rights under the Right to Repair scheme;
  • give you the name, address and phone number of their usual contractor and at least one other contractor from a list; and
  • make arrangements with you to get into your home to carry out the repair.

How long does Grampian Housing Association have to carry out the repair?

Repair times depend on the type of repair.

If your toilet is not flushing, we usually have one working day to come and repair it.  But we have three working days to mend a loose bannister rail and seven working days to mend a broken extractor fan in your bathroom or kitchen. These times are set by law, not by Grampian Housing Association.

Sometimes there may be circumstances which Grampian Housing Association or our contractor has no control over which make it impossible to do the repair within the maximum time (for example, severe weather).  In these circumstances we may need to make temporary arrangements and to extend the maximum time.  If we are going to do this, we must let you know.

What happens if the work is not done in time?

If our usual contractor does not start the qualifying repair within the time limit set, you can tell another contractor from Grampian Housing Association's approved contractors list to carry out the repair.  You cannot use a contractor who is not on approved contractor's list.  The other contractor will then tell us that you have asked them to carry out the repair.  Grampian Housing Associaition will then pay you £15 compensation for the inconvenience.  If Grampian Housing Association's main contractor has started but not completed the repair within the maximum time, you will also be entitled to £15 compensation.

How long does the other contractor have to complete the repair?

The other contractor has the same length of time to carry out the repair as our main contractor.  If they do not carry out the repair within the time limit set, you will be entitled to another £3 compensation for each working day until the repair has been completed.  This amount can add up to a maximum compensation payment of £100 for any one repair.

What if there is no other contractor available?

In this case, our main contractor will carry out the repair but you will still be entitled to the £15 compensation payment.

What happens if I am out when the contractor calls to carry out the inspection or repair?

If the contractor cannot get into your home at the time you have agreed with us, your right to repair will be cancelled. You will then have to re-apply and start the process again.

Who pays for the repair?

Grampian Housing Association pays for the repair.  If you have told another contractor to carry out the repair, the contractor should send the bill direct to the us.

Latest News

New Chair and Vice Chair elected by Gram…

Dr Abhishek Agarwal (above left), course leader for the Aberdeen Business School MBA Programme at Robert Gordon University (RGU) has been elected as the new chairman of Grampian Housing Association...

Read more

Fire damage at historic Aberdeen school …

A new image shows the destruction caused by the fire that tore through Aberdeen’s old Victoria Road Primary in May. The Torry blaze caused the roof to partly cave in and...

Read more

Grampian now owns Victoria Road School

A milestone has been reached in the regeneration of the former Victoria Road School in Torry, Aberdeen.  Transfer of ownership of the site has now completed and the keys have been...

Read more

Office Closure - Monday 6 May 2019

Our Aberdeen and Elgin offices will be closed on May Day (Monday 6 May 2019).  Please call 0300 123 9279 to report an EMERGENCY REPAIR (e.g. significant leak or total loss of power). ...

Read more

Public Information Event on Thursday 21/…

A Public Information Event is being held on Thursday 21 February 2019 (3pm – 7.30pm) in the Victoria and Albert Halls, Station Square, Ballater.   The event will give people an...

Read more

Utilita appointed for Our Power Energy S…

We're letting you know that Ofgem has appointed Utilita as the supplier of last resort for Our Power Energy Supply Ltd customers. Customer accounts have moved across to Utilita and you...

Read more

Our Power

No action is needed by customers but we announce that Our Power has closed.   If you are on supply with Our Power you will transferred to another supplier by Ofgem...

Read more

Christmas Office Closure (24/12/18 - 3/1…

This festive season our Aberdeen and Elgin offices will close at 1pm on Monday 24 December 2018 and re-open at 9am on Thursday 3 January 2019. During this period the following arrangements have...

Read more

GHA Celebrates Eco Hero Win

Grampian Housing Association is celebrating its win of the Eco Hero award in the Northern Star Business Awards organised by Aberdeen & Grampian Chamber of Commerce.  The award was presented...

Read more